
STEP 2 - Installing the Low Water Cut-Off
Determine where
to
install the probe control based
on
the following requirements:
1.
If tappings are provided
on
the boiler, the probe
2.
If
no
tapping
is
provided
on
the boiler, the
control must
be
installed
in
a tapping above the probe control can
be
installed
in
a header or
minimum safe water
level, as specified
by
the riser pipe above the boiler. Refer to the
boiler manufacturer. If
no
specified minimum Typical Installation Diagrams below.
safe water level
is
designated, contact the
boiler manufacturer.
NOTE
TYPICAL INSTALLATIONS
On
the
Boiler
(RECOMMENDED)
314
' (2
Omm
)
NP
T
Tappi
ng
. _
~
m
~
.,
----
I
Model RB-24E
Low Water
Gul-oH
~~-
Minimum
Safe
Waler Level
(as
determined
by
the
OOi
l
ill'
manufacturer)
Ho
t
Water
Boil
er
Make
sure
RB-24E
is
located
close
enough
(no
more
than
4 ft.)
to
burner
control
so
the
harness
can
be
connected.
In a Pipe Tee
Above
the
Boiler
To
System
t
Circulating
/
Pump
314'
(2
Omm)
NPT
/
P1peToo
Optional
Isolation
-
--I-+-H--I
,
I>Jl<xlel
RB
-24E
Low
Wate
r
Cut-off
Va
l
\l~
(MUSIOO
inslaUed
above too)
Mjnirn~lm
Safe
Wat€rLevei
(as
determined
by the bolter
mamlfacturer)
C0
......
Hot
WalQf
Bol
I
Qf
STEP 3 - Installing the Low Water Cut-Off
a.
Sparingly, apply pipe sealant to the external threads
(D)
of the probe(A}.
IMPORTANT:
Do
not use PTFE tape. Only use pipe sealant.
For all Application:
1. Make sure probe is installed above minimum
safe water line as determined by the boiler
manufacturer.
2. Make sure that ends and side of the probe
are at least 1/4 (6.4mm) from all internal
metal surfaces.
A
1/4"
(6mm)
1/4"
(6mm)
1
E
"
Komentarze do niniejszej Instrukcji